Hardware for advanced nuclear R&D and test loops.

Test loop components, fixtures, enclosures and prototype hardware for advanced nuclear programs. We support R&D, prototype and non-safety-related hardware under our ISO 9001:2015 quality management system, sourcing through a vetted network that runs stainless and nickel alloys every week. One project manager owns the job start to finish.

How we review it

Your project manager and a technical lead review every print within 24 hours. If your part is safety-related or your PO invokes ASME NQA-1 or 10 CFR 50 Appendix B, we confirm vendor qualification before quoting and tell you plainly if the job isn’t a fit.

Quality + Compliance

AS9100D Compliant · ISO 9001:2015 · ITAR Registered · NIST 800-171 Compliant · Domestic sourcing

What we source

Matched to shops that run stainless and nickel alloys.

Test loop components
Machined stainless.
Flanges + fittings
Turned and milled.
Enclosures + skids
Fabricated and welded.
Instrument mounts
Tight-tolerance brackets.
Heat exchanger parts
Machined or additive.
Fixtures + tooling
For assembly and test.
Prototype hardware
Fast-turn, any process.
Wire harnesses
Built to print.

Specifications

What a typical nuclear R&D job looks like.

Tolerances
±0.005" standard. ±0.001" on critical features.
Materials
304 + 316L stainless, Inconel, carbon steel.
Scope
R&D, prototype + non-safety-related hardware.
Quality
ISO 9001:2015 quality management system.
Documentation
Certs + inspection records. FAI on request.
Quote review
Within 24 hours.

Before it’s built

Nuclear test programs often start from a lab drawing that was never meant for a supplier. We check material and weld callouts, cleanliness and handling notes, and which features will drive cost on a repeat build, and we confirm the quality requirements on your PO before work is placed.

Advanced nuclear questions

Our scope is R&D, prototype, test loop and non-safety-related hardware under our ISO 9001:2015 quality management system. If your PO invokes ASME NQA-1 or 10 CFR 50 Appendix B, note it with your RFQ. We confirm vendor qualification before we quote and tell you plainly if the job isn’t a fit.

304 and 316L stainless, Inconel and carbon steel are the most common. Shops in our network run stainless and nickel alloys every week, and we confirm grade and weld callouts during drawing review.

Yes. Welded enclosures and skids are sourced through fabrication shops in our network, coordinated with the machined components so the assembly ships as one program.

Material certifications and inspection records ship with every order. First article inspection is available on request. List any additional requirements on your PO so they’re priced and scheduled from the start.

Precision Expedited is NIST 800-171 compliant and ITAR registered. If your program falls under ITAR, EAR or DOE export rules, flag it with your RFQ and we’ll confirm handling before quoting.

A STEP file and 2D print, material and finish, quantities and timing, and any quality requirements your PO invokes. Missing something? Send what you have and we’ll ask for the rest.

What makes us different

DFM review before anything runs.

Every drawing reviewed before sourcing. Rework in Inconel costs ten times what it costs in aluminum.

One contact. Full accountability.

One PM from first drawing review through final delivery. No handoffs. No surprises.

Parts inspected before shipment.

Full traceability on every part. Chain of custody from raw stock through outgoing inspection.

The right shop, not the cheapest quote.

Every supplier qualified against AS9100 requirements. Machinists selected for experience in hard material.