Test hardware that keeps programs moving.
Test fixtures, handling and transport equipment, maintenance stands, carts and ground station hardware for defense programs. These builds mix weldments, machined details, sheet metal and harnesses, and we coordinate all of them through a vetted domestic network. One project manager owns the build from RFQ to delivery, so you don’t manage five vendors for one fixture.
How we review it
Your project manager and a technical lead review every print within 24 hours. For test and support equipment we check how weldments and machined details stack up, confirm interface dimensions to your hardware, and sequence each process so the assembly fits the first time.
Quality + Compliance
AS9100D Compliant · ISO 9001:2015 · ITAR Registered · NIST 800-171 Compliant · Weld + fab to print
What we source
Weldments, machined parts, and harnesses, one contact.
- Test fixtures
- Machined and welded.
- Handling equipment
- Cradles, dollies + adapters.
- Maintenance stands
- Welded steel frames.
- Carts + racks
- Fabricated to print.
- Ground station hardware
- Enclosures and mounts.
- Calibration fixtures
- Tight-tolerance plates.
- Test cables
- Built to print.
- Interface adapters
- Machined to your hardware.
Specifications
What a typical support equipment job looks like.
- Tolerances
- ±0.005" standard. ±0.001" on critical features.
- Materials
- Steel, stainless, 6061 aluminum, Delrin, UHMW.
- Processes
- Welding, sheet metal, CNC machining, harness assembly.
- Finishes
- Powder coat, paint, anodize, plating, to print.
- Documentation
- Material certs, inspection records. FAI on request.
- Quote review
- Within 24 hours.
Before it’s built
Support equipment gets built last and needed first. We check weldments that need machining after welding, flag interface dimensions that should be verified against your hardware, confirm finish and marking callouts, and line up every process so one late detail doesn’t hold the whole build.
Test + support equipment questions
Yes. Weldments that need machining after welding are one of the first things we plan for. We sequence welding, stress relief where called out, machining and finishing so critical surfaces are held after the frame is built.
We do. Weldments, machined details, sheet metal, finishing and test cables are coordinated through one project manager, so you get one schedule and one delivery instead of five vendors.
We flag interface dimensions during drawing review and confirm which ones should be verified against your hardware or a master before the build is released.
Yes. Powder coat, paint, anodize, plating and marking are finished to print, and we confirm the callouts before the quote goes out.
Precision Expedited is ITAR registered and NIST 800-171 compliant. Drawings and models are handled under documented access controls from RFQ to delivery, and ITAR work goes only to vetted, ITAR-registered domestic shops.
A STEP file and 2D print, material and finish, quantities and timing, and interface drawings, marking and finish requirements. Missing something? Send what you have and we’ll ask for the rest.