Test hardware built to your test date.

Instrumentation brackets, sensor mounts, test fixtures, rig adapters and qualification articles for flight test and certification campaigns. We source CNC machining, sheet metal, additive and finishing through a vetted network of AS9100D compliant vendors. One contact knows your test date, plans the build around it and tells you early when anything threatens it.

How we review it

Your project manager and a technical lead review every print within 24 hours and work backward from your test date. We confirm material availability, finish lead times and inspection requirements up front, then place the job with a shop that has real capacity inside that window.

Quality + Compliance

AS9100D Compliant · ISO 9001:2015 · ITAR Registered · NIST 800-171 Compliant · FAI on request

What we source

Built around your test window.

Instrumentation brackets
Sensor + probe mounts.
Test fixtures
Vibe, load, handling.
Rig adapters
Interface plates + hardware.
Qualification articles
Built to production drawings.
Wire harnesses
Instrumentation harnesses.
Enclosures
DAQ + electronics housings.
Additive prototypes
Fit-check + development parts.
Repeat builds
Spares for the next article.

Specifications

What a typical flight test job looks like.

Tolerances
±0.005" standard. ±0.001" on critical features.
Metals
Aluminum, titanium, steel alloys, stainless.
Plastics
PEEK, Delrin + high-performance polymers.
Documentation
Material certs, inspection records, FAI on request.
Quantities
One-offs through repeat test articles.
Quote review
Within 24 hours.

Before it’s built

Qualification articles have to represent production, so we confirm the build matches the drawing you’ll certify against. On fixtures and rig hardware we look for features that can relax to save days, materials in stock this week, and finish callouts that add lead time without changing the test. You hear about it before the quote goes out.

Flight test + qualification questions

Yes. We plan the build backward from your test date, confirm material and finish lead times up front, and place the job with a shop that has real capacity in that window. If anything threatens the date, you hear about it early.

Yes. Qualification articles are built to the drawing you’ll certify against, with material certs and inspection records, so the article represents production.

Often. On fixtures and rig hardware we flag tolerances and finish callouts that add lead time without changing the test, and suggest materials that are in stock. You decide what changes before the quote goes out.

Material certs and inspection records ship with every order. When your program requires it, we can provide full quality documentation on each order, including FAI.

Yes. Repeat builds ship at the same revision with the same inspection, through the same contact, so the next article matches the last.

A STEP file and 2D print, material and finish, quantities, your test date and any qualification documentation requirements. Missing something? Send what you have and we’ll ask for the rest.

What makes us different

Planned back from your test date.

Material, finish and inspection lead times confirmed before the quote, not discovered after the PO.

One contact. Full accountability.

One PM from first drawing review through final delivery. No handoffs. No surprises.

Parts inspected before shipment.

Full traceability on every part. Chain of custody from raw stock through outgoing inspection.

Real capacity, not the next open slot.

Every shop is pre-qualified, so we can place your job wherever the capacity fits your test window.