Test hardware built to your test date.
Instrumentation brackets, sensor mounts, test fixtures, rig adapters and qualification articles for flight test and certification campaigns. We source CNC machining, sheet metal, additive and finishing through a vetted network of AS9100D compliant vendors. One contact knows your test date, plans the build around it and tells you early when anything threatens it.
How we review it
Your project manager and a technical lead review every print within 24 hours and work backward from your test date. We confirm material availability, finish lead times and inspection requirements up front, then place the job with a shop that has real capacity inside that window.
Quality + Compliance
AS9100D Compliant · ISO 9001:2015 · ITAR Registered · NIST 800-171 Compliant · FAI on request
What we source
Built around your test window.
- Instrumentation brackets
- Sensor + probe mounts.
- Test fixtures
- Vibe, load, handling.
- Rig adapters
- Interface plates + hardware.
- Qualification articles
- Built to production drawings.
- Wire harnesses
- Instrumentation harnesses.
- Enclosures
- DAQ + electronics housings.
- Additive prototypes
- Fit-check + development parts.
- Repeat builds
- Spares for the next article.
Specifications
What a typical flight test job looks like.
- Tolerances
- ±0.005" standard. ±0.001" on critical features.
- Metals
- Aluminum, titanium, steel alloys, stainless.
- Plastics
- PEEK, Delrin + high-performance polymers.
- Documentation
- Material certs, inspection records, FAI on request.
- Quantities
- One-offs through repeat test articles.
- Quote review
- Within 24 hours.
Before it’s built
Qualification articles have to represent production, so we confirm the build matches the drawing you’ll certify against. On fixtures and rig hardware we look for features that can relax to save days, materials in stock this week, and finish callouts that add lead time without changing the test. You hear about it before the quote goes out.
Flight test + qualification questions
Yes. We plan the build backward from your test date, confirm material and finish lead times up front, and place the job with a shop that has real capacity in that window. If anything threatens the date, you hear about it early.
Yes. Qualification articles are built to the drawing you’ll certify against, with material certs and inspection records, so the article represents production.
Often. On fixtures and rig hardware we flag tolerances and finish callouts that add lead time without changing the test, and suggest materials that are in stock. You decide what changes before the quote goes out.
Material certs and inspection records ship with every order. When your program requires it, we can provide full quality documentation on each order, including FAI.
Yes. Repeat builds ship at the same revision with the same inspection, through the same contact, so the next article matches the last.
A STEP file and 2D print, material and finish, quantities, your test date and any qualification documentation requirements. Missing something? Send what you have and we’ll ask for the rest.