An advanced energy developer needed the main structural frames for a large system assembly. We delivered them welded, machined and inspected stateside, with one project manager from the first drawing to the last oversize truck.

±0.0005″

Held after welding

10′ x 9′ x 6′

Machining envelope, one setup

1

PM, start to finish

The Challenge

This was first-of-a-kind hardware with no supply chain to lean on. The frame sets the datums for everything mounted to it, so weld distortion or a bore off-location shows up as alignment trouble across the whole build.

Size and weight ruled out overseas freight. Few US shops can weld and machine a structure this size, and a frame too heavy to ship twice turns every correction into weeks. Capacity is tight, too: US electric companies invested $208 billion in 2025 to build out the grid, according to the Edison Electric Institute, and the American Welding Society projects the US will need 320,500 welders by 2029. Large-frame capacity is the first to go.

Electrical substation with transformers and steel structures

How We Delivered

Welder in safety glasses joining a structural steel frame

One project manager reviewed every drawing the day the files arrived. DFM feedback came with the quote, so risk surfaced before the PO instead of on the shop floor.

  • Caught what couldn’t be built. The prints called out tolerances the part couldn’t hold. We built an alternate with the shop and got it approved before it reached the floor.
  • One shop, start to finish. A vetted US shop in our network welds, machines and inspects in one building, so datums hold from weld to final bore. Bores and datums are machined after welding, and every frame ships with a full CMM report.
  • Weekly updates, freight handled. The same person checked in every week from PO to shipment and arranged every oversize shipment for the customer.

One project manager, from the first drawing to the last oversize truck.

Your manufacturing team. Without the overhead.

The Result

The frames held ±0.0005″ after welding, so the assembly lined up at integration. An unholdable callout was caught in DFM, reworked with the shop and approved before it reached the floor.

Clear communication and transparent updates earned the next orders. Our engineering and DFM support and fabrication network cover the same work for advanced energy teams building at this scale.

Frequently asked questions

The shop behind this program machines weldments up to 10′ x 9′ x 6′, five sides in one setup, with 10-ton crane capacity. Send us the drawings and we’ll match larger or different work to the right shop in our network.

No. Every shop in our network is pre-qualified, so we can move a job to the shop with the right equipment and open capacity without you requalifying anyone. You keep one point of contact the whole way through.

Requirements vary by project, and we can provide full documentation when necessary on each order. On this program, every frame shipped with a full CMM report. See our certifications and compliance page for details.

Send us the drawings.

A real person will contact you within 24 hours.

Request a Quote

Built fast. Built right.


Related Articles