A first article inspection proves that a supplier’s process can make your part to the drawing before you pay for a full production run. On aerospace and defense programs it is usually a contract requirement, and the format is set by AS9102. Buyers who know what a complete FAI looks like catch gaps early, when they cost a phone call instead of a lot of scrapped parts.

What first article inspection is

A first article inspection, or FAI, is a full verification of one production-representative part against every requirement on the drawing and purchase order. That means every dimension, every note, the material, any special processes such as heat treat or plating, and any functional tests. The part has to come from the same process, tooling, and shop that will run production. A prototype made on different equipment doesn’t count.

AS9102 is the aerospace standard that defines how the results get recorded. It is referenced by AS9100 and flowed down in most aerospace and defense purchase orders. Our post on what AS9100 actually requires of a vendor covers the quality system around it.

The three AS9102 forms

Form 1, Part Number Accountability, identifies the part: part number, revision, drawing number, and the organization doing the inspection. For assemblies it lists every sub-part and its own FAI reference.

Form 2, Product Accountability, covers what went into the part. It records the raw material and its certification, every special process with the processor and its approval, and any functional testing. This is where a missing material cert or an unapproved plating house shows up.

Form 3, Characteristic Accountability, is the measurement record. Every characteristic on the drawing gets a number, called a balloon, and a line on the form with the requirement, the measured result, and the tool used to check it. Notes count as characteristics too, including general tolerances, edge breaks, and marking requirements.

The ballooned drawing

The ballooned drawing is the key to the whole package. Each balloon number on the drawing matches a line on Form 3, so anyone reviewing the FAI can trace every requirement to a result. When an FAI comes back with fewer balloons than the drawing has requirements, something was skipped. Count them. It takes five minutes and it is the fastest way to judge whether a report is complete.

When a new FAI is required

An FAI is not a one-time event. AS9102 calls for a full or partial FAI when any of these change:

  • A design change that affects form, fit, or function
  • A change in manufacturing source, process, location, or tooling
  • A change in numerical control program or its translation to another medium
  • A natural or man-made event that may affect the process
  • A lapse in production of two years for that part

A partial FAI, sometimes called a delta FAI, only re-verifies the characteristics the change could affect. Moving a part to a new shop usually means a new FAI, which is why switching suppliers mid-program takes planning. We cover that in vendor requalification mid-program.

FAI vs. PPAP

Both approve a production process, but they come from different industries. FAI under AS9102 is the aerospace and defense method and centers on the three forms above. PPAP is the automotive method. It includes dimensional results too, plus items like process flow diagrams, PFMEA, control plans, and capability studies, packaged at a submission level the customer chooses. Some industrial and medical customers ask for one or the other, or their own format. Your purchase order should say which.

What buyers should check on an FAI report

  • Part number and drawing revision on Form 1 match your current PO
  • Material certs on Form 2 match the material specification on the drawing
  • Every special process lists a processor approved for that process
  • Balloon count on the drawing matches the line count on Form 3
  • Every result is a measured value, not “OK” or “conforms,” wherever the characteristic is variable
  • Any nonconforming result has a disposition, not a blank

If a characteristic fails, the FAI isn’t complete until the cause is fixed and the characteristic is re-verified. Our post on who owns the fix when a part fails inspection walks through that process.

How PE handles first article inspection

PE is AS9100D Compliant and ITAR Registered, and our network includes AS9100D registered shops. FAI and documentation requirements vary by program, so we work from what your drawing and purchase order call for, and PE can provide full documentation when necessary on each order. Every part runs through our San Clemente office for inspection before it ships to you. See our certifications and compliance page for details, and our aerospace and defense pages for the programs we support.

Frequently asked questions

A complete verification of one production-representative part against every drawing and purchase order requirement, done before full production to prove the process makes good parts.

The aerospace standard that defines the FAI process and its three forms: part number accountability, product accountability, and characteristic accountability.

After a design change that affects form, fit, or function, a change in source, process, location, tooling, or NC program, an event that may affect the process, or a two-year lapse in production.

FAI is the aerospace and defense method built on AS9102 forms. PPAP is the automotive method and adds process documentation such as control plans and PFMEA.

Send us the drawings.

A real person will contact you within 24 hours.

Request a Quote

Built fast. Built right.


Related Articles