Defense

Controlled data, domestic sourcing, documentation, and lead times for defense programs, from an ITAR Registered, NIST 800-171 Compliant team.

Talk to Us
Precision CNC-machined aluminum structural housing with circular flange, mounting holes, and lightweight ribbed supports.

Aerospace, Defense, Sourcing + Supply Chain

First Article Inspection: What AS9102 Requires Before Production

Ballooned drawings, three AS9102 forms, and the changes that trigger a new FAI. What first...

Read More
CNC machines and metalworking tools on a manufacturing shop floor

Aerospace, Defense, Sourcing + Supply Chain

Onshoring Manufacturing: What It Takes to Move a Part Back to the US

Onshoring takes more than a new address on the PO. What changes in cost, requalification,...

Read More
CNC milling machine cutting an aluminum part

Aerospace, CNC Machining, Defense, Engineering Support + DFM

6061 vs. 7075 Aluminum: How to Choose an Alloy for Machined Parts

7075 is nearly twice as strong as 6061. 6061 welds, resists corrosion, and costs less....

Read More
CNC machine cutting a metal workpiece

Aerospace, Defense, Engineering Support + DFM, Sourcing + Supply Chain

Defense Wants Speed and Volume. Suppliers Are Where That Gets Decided

Drone and munitions programs are scaling fast under domestic sourcing rules. What defense hardware teams...

Read More
Circular six-pin connector with a square mounting flange

Defense, Sourcing + Supply Chain

CMMC Phase 2 was paused, but NIST 800-171 and DFARS obligations still apply. Five questions...

Read More
Black and white close-up of a jet engine fan and spinner

Advanced Energy, Aerospace, CNC Machining, Defense, Engineering Support + DFM

Inconel 718 Machining: What Drives Cost, Lead Time, and Tool Life

Inconel 718 keeps its strength past 1,200°F and fights the cutter the whole way. What...

Read More
Engineers reviewing work in a manufacturing facility

Aerospace, Defense, Sourcing + Supply Chain

QMS in Manufacturing: How We Control Quality Across a Vendor Network

AS9100D Compliant and ISO 9001:2015. How our QMS reaches every vendor shop, from first article...

Read More
Interior of a large industrial factory

Aerospace, Defense, Sourcing + Supply Chain

Supplier Management: 6 Checks Before a Shop Gets Your Part

Qualification, scoped approval, flow-down, first article, scorecards, and corrective action. How we decide which shop...

Read More
Satellite with extended solar arrays in orbit above Earth

Aerospace, Defense

Aerospace and defense capacity is tight, and "we're backed up" has become the default excuse....

Read More